Recently Published
Thorn Creek WEPP - Thorn Daymet 11 NT, MAN by ROT, FC32, BD168, KSAT by Hyd_Grp (MID-LOW), KSUB15
Ksub = 15
Bulk Density = 1.68
Field Capacity = 0.32 (32%)
Ki = 200
Kr = 5E-9
Tc - 4.35
Ksat is assigned by hydrologic group (A=144, B=90, C=10, C/D=0.4)
Management files substituted by rotation ONLY. No other files substituted unless rotation is defined beforehand by hillslope
Thorn Creek WEPP - WEPP Run Iteration 392
FILE: Thorn Gridmet 4
Output:
-WY NSE = 0.07
-SY NSE = -107.76
-WY (mm) = 87.46 [Actual WY = 118 mm]
Water Budget Breakdown:
-ET = 35.92%
-RO = 0.8%
-LAT = 0.03%
-PERC = 13.89%
-BASE = 13.89%
Thorn Creek WEPP - Baseline WEPP Run
FILE: Thorn Gridmet 4
Output:
-WY NSE = -0.002
-SY NSE = -49.49
-WY (mm) = 92.1 [Actual WY = 118 mm]
Water Budget Breakdown:
-ET = 34.5%
-RO = 0.88%
-LAT = 0.10%
-PERC = 14.68%
-BASE = 14.69%
Thorn Gridmet V1.2 - Iteration 289
Bedrock Ksat = 8.2 mm/hr
FC = 32%
Snow/Rain Thres. = -2.0 deg. C
Crop Coeff. = 0.98
WEPPCloud - Thorn Gridmet V1.2 - PCD Discharge vs. WEPP Runoff
New WEPPCloud file for Thorn Creek. Second variation using Gridmet as climate file. Utilizes more hillslopes, with shorter channels and less acres per hillslope
Kamiache Creek Mean Daily Sediment Load Estimates from LOADEST
Kamiache Creek Mean Daily Sediment Load Estimates from LOADEST for WY2017 through 2019
Kamiache Creek Total Sediment Load Estimates from LOADEST
Kamiache Creek Total Sediment Load Estimates from LOADEST - WY2017 through 2019
Thorn Creek Total Sediment Load Estimates from LOADEST
Thorn Creek Total Sediment Load Estimates from LOADEST - WY2017 through 2019
Thorn Creek Mean Daily Sediment Load Estimates from LOADEST
Thorn Creek Mean Daily Sediment Load Estimates from LOADEST for WY2017 through 2019
Cow ISCO Stage
Graph of Cow Creeks stage measurements via StormCentral, paired with ISCO sample collection dates